The Daily Baku
International
Major overhaul carried out on Alabashli–Gizilja railway section
April 13, 2026
12:41

Azerbaijan Railways CJSC (ADY) has carried out major repair works on the Alabashli–Gizilja railway section.
This was reported by the company.
“The 20-kilometer line, which has been renovated for the first time since it was put into operation in the 1950s, will ensure the safe transportation of construction materials essential for railways, particularly ballast and crushed stone,” ADY said.
© 2026 The Daily Baku. All rights reserved.
https://dailybaku.az/en/article/major-overhaul-carried-out-on-alabashligizilja-railway-section