Train movement in Baku Metro CJSC has been fully restored, and the system is operating at full capacity.
According to The Daily Baku, citing the joint-stock company, operations across all lines have been stabilized.
Trains are running on the most intensive schedule possible within current technical capabilities.
Control over technical systems has been strengthened, and monitoring continues without interruption.
© 2026 The Daily Baku. All rights reserved.
https://dailybaku.az/en/article/baku-metro-cjsc-resumes-normal-operations
